
R&D
Our R&D Studies


Eneko Test Laboratory
- Heat recovery efficiency,
- Flow-external pressure test,
- Indoor/outdoor air leakage test,
- power consumption values are measured, defined, and reported.
In the test laboratory, air flow is measured with venturi tubes. There are also humidity sensors, thermocouples, pressure transmitters, sound meters, and leakage rate detection devices.
The CFD program (Ansys-Fluent) is used in optimization projects such as EPS body design and fan/exchanger configuration.
HIGHLIGHTS
R&D Highlights
Advanced Technology and R&D Leadership through Innovation
"Airlogic" Selection Program
Eneko has been working for 3 years to develop its own selection software called "Airlogic". With the Eurovent Certified software, customizable air handling units and compact units can be selected.
Automation Software
Instead of outsourcing automation, Eneko works on the controller software with its experienced team. This provides the flexibility to create smart units with unique scenarios.
Technology Focused Projects
Using the Latest Technologies with Advanced Technology, Combination of Innovation and Technology...